Wastewater Treatment System Design for the Village of Stockholm

The Village of Stockholm, Wisconsin (Village) is located on the Western edge of Wisconsin, along the Mississippi River and Lake Pepin in Pepin County. The following geotechnical report has been prepared for the Village as part of proposedimprovements to theVillage’sWastewater Treatment System.The Village has selected E&F Consulting to design a wastewater treatment system for Village […]

Read More… from Wastewater Treatment System Design for the Village of Stockholm

Feasibility study of composting manure

Pepin County, Wisconsin is home to many dairy farms which commonly use animal manure as fertilizer for fields. High concentrations of the nutrients nitrogen, phosphorus, and potassium make the manure an effective fertilizer. However, this can result in runoff containing high levels of these nutrients which can lead to damage of ecosystems, health risks, and […]

Read More… from Feasibility study of composting manure

Industrial park designs for Durand

Students in the Department of Civil & Environmental Engineering at the University of Wisconsin-Madison as an activity in the course Civ Engr 578 –Senior Capstone Design/GLE 479 –Geological Engineering Design prepared concepts, drawings and written materials for a small manufacturing industrial park for the City of Durand in Pepin County, Wisconsin. UniverCity Year Contact Info […]

Read More… from Industrial park designs for Durand

Camp Courageous Wellhead Protection

As part of their Senior Design Capstone course, Civil & Environmental Engineering students will explore alternatives and make recommendations to reduce contaminants in the source water that serves Camp Courageous. Camp Courageous is a 501(c)(3) non-profit organization that provides year-round recreational and respite care opportunities for individuals with special needs. Camp Courageous offers a variety […]

Read More… from Camp Courageous Wellhead Protection

Manchester – Early Stage Coach Road Relocation

As part of their Senior Design Capstone course, Civil & Environmental Engineering students developed a plan to close a section of road to accommodate local airport clearances, and designed a new section of road to reroute traffic. Manchester Municipal Airport is located at 1561 Early Stagecoach Road. Runway 18/36 runs perpendicular to Early Stagecoach Road, […]

Read More… from Manchester – Early Stage Coach Road Relocation

Manchester – Shelly Park Redevelopment

As part of their Senior Design Capstone course, Civil & Environmental Engineering students created designs for improvements to Manchester’s Shelly Park, a highly used amenity adjacent to the whitewater rafting course on the Maquoketa River. Shelly Park Redevelopment has a couple design challenges. The City of Manchester’s goal for the park redevelopment is to include […]

Read More… from Manchester – Shelly Park Redevelopment

Manchester – Waterway and Dry Run Remediation and Redevelopment / Plan for Displaced Households

As part of their Senior Design Capstone course, Civil & Environmental Engineering students designed stormwater infrastructure to minize flooding impacts in Manchester, particularly for structures newly identified as being in the floodplain after recent redrawing of maps. In 2015, the Iowa Department of Natural Resources conducted a map update of the City’s waterways along the […]

Read More… from Manchester – Waterway and Dry Run Remediation and Redevelopment / Plan for Displaced Households

Waterloo – Master Plan for former Edison School

Civil & Environmental Engineering students created a site development plan for the area around the former Edison Elementary school building. The City of Waterloo is considering alternatives for redevelopment of a site that was the location of the now-closed Edison Elementary School. One of the most important considerations for the project would be that it […]

Read More… from Waterloo – Master Plan for former Edison School

Waterloo – Prairie Trail Bridge Replacement

Civil & Environmental Engineering students created a design for replacement of a pedestrian bridge for the Cedar Prairie Trail in Waterloo, Iowa. The City of Waterloo hopes to replace two pedestrian bridges along the Cedar Prairie Trail that cross Black Hawk Creek. Both existing bridges are located south of Ranchero Road. The northern bridge spans […]

Read More… from Waterloo – Prairie Trail Bridge Replacement

Manchester – Fire Department Cold Storage Building and Parking Lot Engineering & Design

As part of their Senior Design Capstone course, Civil & Environmental Engineering students created designs and provided cost estimates for an expansion to the Manchester Fire Department. The Manchester Fire Department recently acquired a lot behind the fire station and have an interest in using the space to construct a storage facility and pave the […]

Read More… from Manchester – Fire Department Cold Storage Building and Parking Lot Engineering & Design

Translate »