Flood Early Warning System for the City of Manado, North Sulawesi, Indonesia

The city of Manado, situated in the North Sulawesi province of Indonesia, is a vibrant hub for international tourism. Thousands of visitors flock to this provincial capital city with an interest in hiking the lush trails of Bunaken National Park or snorkeling in the colorful coral reefs of the Celebes Sea. However, underneath its picturesque […]

Read More… from Flood Early Warning System for the City of Manado, North Sulawesi, Indonesia

Lusaka’s Expanding EPIC Partnerships Look to Solve Capacity Issues 

Like many other African cities, Lusaka is facing rapid urbanization and various challenges related to inequality, climate change, economic opportunity, and service delivery. The city is faced with limited technical capacity to deliver essential services to all 3.3 million people and with a growth rate of about 5% annually, Lusaka’s Local Authority is unable to […]

Read More… from Lusaka’s Expanding EPIC Partnerships Look to Solve Capacity Issues 

TriMet Southwest Barbur Boulevard Stormwater Capstone Project

This project was designed by ALBA Consulting. ALBA Consulting is an academic exercise comprised of four members of an undergraduate capstone class in engineering at Portland State University during winter and spring terms, 2018. ALBA Consulting strives to be a steward of sustainable solutions by engineering effective future assets for the communities we serve. The […]

Read More… from TriMet Southwest Barbur Boulevard Stormwater Capstone Project

Pelham Industrial Park Wastewater Management Analysis

The Pelham Industrial Park, located in Grundy County, TN, is a prime industrial location seeking to recruit new industrial partners. The park infrastructure is currently limited by water and sewer availability, negatively impacting potential growth. An analysis of utility conditions, projected utility needs, and recommendations for solutions to existing concerns is required. In addition to […]

Read More… from Pelham Industrial Park Wastewater Management Analysis

Bus Shelter Planning and Design

Students will research and provide planning information to inform design criteria for bus shelters as well as strategies for paying for the shelters in accordance to the updated transit plan developed by the Cleveland Urban Area Transit System. Read the final student report delivered to the local gov/community partner. Smart Communities Initiative Contact Info University […]

Read More… from Bus Shelter Planning and Design

Sidewalk Planning for Blythe Avenue and the Wildwood/Dalton Pike Area Neighborhoods

Students will complete a comparative analysis and provide Cleveland with at least three alternative routes for sidewalk construction for a section of Blythe Avenue. Students will conduct a sidewalk planning exercise to evaluate alternative routes for connecting adjacent neighborhoods to the Wildwood Avenue/Dalton Pike. The resulting report could become a supporting basis for future federal […]

Read More… from Sidewalk Planning for Blythe Avenue and the Wildwood/Dalton Pike Area Neighborhoods

Engineering Upgrades to Winnequah Park

Perform a comprehensive design review of Winnequah Park. Read the final student report delivered to the local gov/community partner. UniverCity Year Contact Info Gavin Luter Managing Director gavin@cows.org 608-261-1141 University Faculty Contact Greg Harrington Civil and Environmental Engineering Professor gwharrin@wisc.edu (608) 695-3381 Local Government / Community Contact Jake Anderson Parks and Recreation Director of Parks […]

Read More… from Engineering Upgrades to Winnequah Park

Neighborhood and Workplace Electric Vehicle Charging Deployment

Part of Tacoma’s vision for an environmentally responsive future involves electric vehicles. In order to support the use of these vehicles, the City needs to strengthen our charging infrastructure. However, the City must assess where charging stations should be deployed? Should it be in the right-of-way, multifamily development, or workplaces? The City needs to develop […]

Read More… from Neighborhood and Workplace Electric Vehicle Charging Deployment

Translate »