Multi-Generational Community Engagement (2/2)

The city’s mission is to improve the lives of the people they serve, and its vision is to be the community of choice for residents, businesses, and employees. Additionally, the city’s Strategic Plan and Balanced Scorecard are designed to drive performance throughout the organization towards one common objective – improving the community experience. The results […]

Read More… from Multi-Generational Community Engagement (2/2)

Transit Circulator Best Practices (1/2)

Choosing viable transportation options for everyday activities is a big step in decreasing an individual’s carbon footprint and leading a more sustainable lifestyle. Every day, people opt to use public transit, ride a bicycle, or carpool to decrease their carbon footprint. In many cases, though, an individual’s ability to practice sustainable transportation can only be […]

Read More… from Transit Circulator Best Practices (1/2)

Recommendations for Trail-Oriented Development along the Wilburton Segment of the Eastside Rail Corridor Trail

With the Eastside Rail Corridor providing a regional, north-south, non-motorized connection through the city; the Mountains to Sound Greenway running east-west; the completion of the 520 Trail; and the I-90 Trail, along with other trail connections throughout the city, there is great opportunity to better define the role of adjacent development in activating these trails […]

Read More… from Recommendations for Trail-Oriented Development along the Wilburton Segment of the Eastside Rail Corridor Trail

Revitalization Area Planning Toolkit

This project would complement the Pierce Transit High Capacity Transit feasibility and design study by working with local businesses and residents within a walk distance of two key intersections along the Pacific Avenue corridor at S 38th and S 56th, to explore place-making strategies that could be implemented in conjunction with transit station construction and […]

Read More… from Revitalization Area Planning Toolkit

Transit Station Area Placemaking

This project would complement the Pierce Transit High Capacity Transit feasibility and design study by working with local businesses and residents within a walk distance of two key intersections along the Pacific Avenue corridor at S 38th and S 56th, to explore place-making strategies that could be implemented in conjunction with transit station construction and […]

Read More… from Transit Station Area Placemaking

Connectivity Element for Comprehensive Plan

The purpose of a connectivity element is for the city to be more strategic in its efforts to physically, socially, culturally, and economically connect Auburn. This project includes a problem assessment, mapping exercise, and development of suggestions for code updates and infrastructure improvements for physical connectivity. The deliverable will be provided in a format resembling […]

Read More… from Connectivity Element for Comprehensive Plan

Assessing Benchmarking Strategies to Encourage Smart Buildings in Bellevue

The Bellevue Comprehensive Plan identifies a Civic Center District surrounding Bellevue City Hall. This Civic Center vision would integrate City Hall, the “Metro property” adjacent to City Hall, Meydenbauer Convention Center (and its expansion), the existing Transit Center, and the future light rail station. It would interface with the Grand Connection (Meydenbauer Bay to Eastside […]

Read More… from Assessing Benchmarking Strategies to Encourage Smart Buildings in Bellevue

Tacoma 2025 Baseline Data Collection

Tacoma 2025, the City’s strategic plan, is the visioning document to inform elected and staff decision-making. Out of the strategic planning process, a set of indicators were developed around our seven core values. In order to create specific goals, an implementation strategy, and viable targets, the City needs to collect, analyze, and report baseline data. […]

Read More… from Tacoma 2025 Baseline Data Collection

Translate »