Consultancy Services for preparation of Detailed Project Report for Rehabilitation and Upgradation to two lane with paved shoulder configuration of Araku (Bhalluguda) to Bowdara Section of NH – 516 E in state of Andhra Pradesh.

B. Description of the Subprojects The objective of the MORTH’s Project Financing Facility is to support the projects for improving Andhra Pradesh State’s connectivity of the current rural interior and achieving a larger coverage of the National Highway and State Highway. The loan from the MORTH will be on – lent to the Government of […]

Read More… from Consultancy Services for preparation of Detailed Project Report for Rehabilitation and Upgradation to two lane with paved shoulder configuration of Araku (Bhalluguda) to Bowdara Section of NH – 516 E in state of Andhra Pradesh.

Mapping urban inundation areas for sustainable drainage and waterlogging management to climate change. The case of Vietnam’s Mekong Delta

Due to its topography and tropical monsoon climate, Vietnam is susceptible to the detrimental effects of climate change. Unfortunately, the infrastructure in the Mekong Delta Region is inadequate and unable to manage the consequences.  An Giang is the upstream province of the Mekong Delta, hence the floods depth and length are more and longer than in […]

Read More… from Mapping urban inundation areas for sustainable drainage and waterlogging management to climate change. The case of Vietnam’s Mekong Delta

Translate »